University of Illinois Extension

Quiz

Instructions for Conducting Percolation Tests 905 Appendix A, Illustration G

  1. Instructions for Conducting Percolation Tests 905 Appendix A, Illustration G
    At least 3 separate percolation tests must be performed with the holes being separated by a distance of ____ feet.
  2. Instructions for Conducting Percolation Tests 905 Appendix A, Illustration G
    An 18 hour waiting period between presoaking and the percolation test may be waived if
  3. Instructions for Conducting Percolation Tests 905 Appendix A, Illustration G
    The only acceptable results from the percolation test are from