University of Illinois Extension

Quiz

Section 906.30 — Soil and Site Requirements

  1. Section 906.30 — Soil and Site Requirements
    During mound construction, for shallow permeable soils over pervious bedrock, the percolation test shall be run at:
  2. Section 906.30 — Soil and Site Requirements
    At the proposed mound site, there shall be:
  3. Section 906.30 — Soil and Site Requirements
    High water tables can be determined:
  4. Section 906.30 — Soil and Site Requirements
    When preparing the site: