University of Illinois Extension

Quiz

Section 906.40 — Fill Material

  1. Section 906.40 — Fill Material
    Above the absorption area:
  2. Section 906.40 — Fill Material
    A mound system shall be provided with a fill material beneath the absorption area (trenches or bed). One of the following fill materials shall be used.